Smash Robotics logoSmash Robotics

Engagement model

One station first. The next one is your call.

Nothing else changes until the first station holds pace. A one-time build, a subscription per station, compute at cost.

Sequence

One station → the same line → the next task

Engineers working at an automated station on the floor
[Replace with photography from a live install]
  1. Phase 01
    01

    First station

    One task · one station

    We build and train the station, on site until it holds pace through a normal shift.

  2. Phase 02
    02

    Same line

    More stations · same task

    Once one bench works, the next is a repeat, not a project. Updates roll out one station at a time.

  3. Phase 03
    03

    Next task

    New task · your timing

    The next job, chosen by what's hardest to staff this quarter. Your timing.

Pricing

Four lines

Structure published; figures quoted once we've seen the task.
Smash Robotics pricing structure
LineBasisDetail
Floor walk & task assessmentFixed fee, credited if you proceedWe time the task and tell you if it can be automated today. Sometimes the answer is not yet.
First station buildOne-time, per stationSourcing, install, training on your parts, engineers on site until it runs a shift.
Managed runningPer station, per yearOn-call cover, retraining, staged updates and rollback. Cancel and it keeps running.
ComputeMetered pass-throughBilled at cost, no margin. You see the usage.

FAQ

Direct answers

What does a first engagement cost?

A one-time build, a subscription per station we manage, and compute at cost. Figures quoted once we've seen the task.

How long until the first station runs?

Depends on the task and parts. We scope it before you sign anything.

Why price per station, not per user?

The value is in tasks running, not logins. Per-seat would penalize giving supervisors visibility.

What if we stop after the first station?

It keeps running. You keep the data, the model, and the runbooks.

Want a figure for your task? .